Division: Bridges
Project Name: Boeing Access Rd over BNRR Bridge Rehabilitation
Location: North of City, off of I-5
Description: Rehabilitate the existing bridge that will be 110' wide curb to curb with sidewalks on both sides.
Funding: City Revenue, 104 Arterial Street Fund, and Federal Bridge grant of $9,745,600 that requires a 20% local match.
Project Status: Design began in late 2013 and is currently at 90%. Ad date for construction bid late summer 2015, dependent on railroad permits.
Estimated Timeline:Â Design in 2013/2014 with construction in 2015.